|
|
October 31, 2004
First piece of sheet metal on bottom. |
|
|
December 5, 2004
Bottom is complete with holes cut for posts. |
|
|
December 20, 2004
Here you can more clearly see the top of the impulse engines or thrusters or whatever. Still missing the sides, though. |
|
|
01-10-2005
Sides of impulse engines built, attached, and even has sheet metal screwed down. Also finished the top of the door on the rear. |
|
|
01-14-2005
Roof pieces attached. |
|
|
01-14-2005
Roof pieces attached. View from standing on top. - These are the pieces that were later replaced due to leaking problems. |
![]() |
01-21-2005
Got some more sheet metal on the sides. |
![]() |
04-01-2005
Nosecone started, bottom piece finished. |
![]() |
04-01-2005
side view, can see the total shape of the craft for the first time. |
|
|
05-02-2005
Bottom side-panels on boths sides completed. |
|
|
05-09-2005
Completed most of the sheet-metal on the back. |
![]() |
05-24-2005
Attached triangular pieces to bottom of nosecone. |
![]() |
05-24-2005
View from inside the shuttlecraft looking out the front. |
![]() |
06-26-2005
temporary wooden window installed. |
![]() |
11-25-2005
Most of outer hull is finished and supports for warp engines added. |
![]() |
11-25-2005
View from inside. Can see frames for front seats, and bunk bed frame on left. |
![]() |
11-25-2005
Rear view. |
![]() |
03-12-2005
Added some more flooring to the front cockpit. |
![]() |
03-12-2005
Created the table with chairs, more like a booth. Also some flooring under the chair. |
![]() |
04-03-2005
Sanded and primed, a second time. First time it rained before the primer dried and washed it all away. |